A Plant Engineering Systems Specialty Site  ·  plantengineeringsystems.com ↗
Services Solutions Configure Work Start a Project Start a Project
Paper Plant Engineering

Corrugated.
Tissue.
Power.

Fixed-price engineering packages for pulp and paper producers — corrugated greenfield facilities, tissue converting lines, utility infrastructure, and high-capacity power upfits. Scoped and delivered by one integrated engineering team.

4 Pulp & paper packages — facility, line, utility, power
$8.2M Maximum power upfit package — substation through MCC
7 Disciplines — one team, one contract, no gaps

Corrugated Box Greenfield

Our most comprehensive paper industry offering — a full-facility greenfield package for corrugated box producers. Covers corrugator hall, converting area, starch system, warehouse and logistics, and all supporting utility and electrical infrastructure.

Corrugated box plant facility
Facility Package · All 7 Disciplines

Corrugated Box Greenfield

Complete engineering, design-build, and integration for a new corrugated box manufacturing facility. Corrugator hall, in-line and off-line converting, starch preparation, dust collection, compressed air, and full warehouse logistics flow — all under one fixed-price contract.

Contact for facility-scale pricing
  • Corrugator hall layout and equipment integration
  • In-line and off-line converting area design
  • Starch preparation and distribution system
  • Dust collection and fire suppression systems
  • Compressed air generation and distribution
  • Warehouse layout and logistics flow design
  • Full electrical, controls, and civil scope
Start the Conversation

Tissue, utility & power — standalone or combined.

Line and utility packages engineered for pulp and paper facilities — available as standalone scopes or combined with a greenfield or expansion program.

Tissue converting line rewinder and packaging
Line Package

Tissue Converting Line

Rewinder, log saw, case packing, and palletizing for facial and bath tissue production. Line controls, HMI, and dust management integrated as standard scope.

$2.2M – $5.1M
Packaging Electrical Controls HVAC
  • Rewinder and log saw integration
  • Case packing and palletizing
  • Dust management and collection
  • Line controls and HMI design
  • Conveyor and material handling
Paper converting utility infrastructure
Utility Package

Converting Utility Bundle

Utility infrastructure specifically engineered for converting facilities — MCC and power distribution, dust collection, starch prep, and compressed air. Designed as a system, not sourced piecemeal.

$1.8M – $4.2M
Electrical Process HVAC Civil
  • MCC and power distribution design
  • Dust collection system (fabric filter)
  • Starch preparation and distribution
  • Compressed air generation and piping
  • Utility controls integration
Paper mill high-voltage power infrastructure
Utility Package · High Voltage

Paper Mill Power Upfit

High-capacity electrical infrastructure for large paper mill expansions: main switchgear, transformers, substation design, and MCC — engineered as a coordinated power system, not as individual components.

$3.5M – $8.2M
Electrical Controls Civil
  • Main switchgear selection and design
  • Transformer and substation design
  • MCC and power distribution layout
  • Arc flash study and protection coordination
  • Utility interconnect and commissioning
High-voltage scope
Includes arc flash study, utility interconnect coordination, and protection relay design — not standard at other firms.
Configure Your Paper Package

Pulp and paper facilities demand electrical and civil depth. We bring both.

Paper mill and converting facility projects are heavy on electrical infrastructure and civil coordination — disciplines that many engineering firms sub out separately. PES packages integrate high-voltage electrical, civil and structural, and dust/fire systems as core scope, not add-on subcontracts. One team owns the whole facility.

Process Engineering
Packaging & Line
Electrical & HV
Controls
HVAC & Dust
Civil & Structural
Logistics Engineering
See All Services
Paper and converting plant facility

Planning a new facility or power upfit?

Tell us your facility type, production capacity, and power requirements. We'll scope the right package and have a proposal ready in 72 hours.